A ground-floor retail unit mid strip-out, its shopfront papered over and the ceiling grid coming down.

New York City

Commercial Demolition in New York City

Offices, retail, restaurants, showrooms and end-of-lease strip-outs across all five boroughs, fitted to the fit-out date and to the loading the building actually has.

Call (929) 693-6783What to have ready

The city has more than one commercial market

A loading dock at the back of a commercial building with a roll-off container backed up to it.

Commercial demolition in New York is not one job repeated in five places. The building stock changes completely as you cross a river, and so does the way a strip-out has to be run.

Midtown and Lower Manhattan are towers and prewar lofts with shared freight elevators released in blocks, and a fit-out calendar that everybody on the floor is working to. Downtown Brooklyn and Long Island City are the same shape at a different scale. Retail runs along the avenues in every borough, usually under occupied apartments. Restaurants turn over constantly and bring their own problem, which is everything a kitchen leaves behind. Industrial and warehouse space in Hunts Point, Port Morris, Red Hook, Sunset Park and Maspeth has loading bays, room for a container and almost none of the access constraints that define the rest of the city.

We work across all of it, from Nolita, in the Bronx, Brooklyn, Manhattan, Queens and Staten Island. If you hold space in more than one borough, that is one contractor walking all of it rather than a different one per address.

Strip-outs that fit a schedule

The date you care about is the fit-out date, not ours.

A commercial strip-out is almost never the point of the project. It is the gap between one tenancy and the next, and it is measured against a date somebody has already committed to.

So we plan it backwards from that date. We establish what the building gives us for freight, loading and hours, work out how much material can physically leave in a day, and only then say how long the floor takes. A scope quoted without those three facts is a guess that gets found out in week two.

What comes out is the fit-out: partitions, ceilings and grid, flooring and the screed under it, joinery, casework, shopfronts, kitchen and bar installations, redundant mechanical and electrical, and the pipework and cable behind them. What stays is whatever the next stage needs. Sprinkler and standpipe, risers, base building services and anything a landlord requires back in place are identified before we start, then marked and protected.

Four commercial jobs that share a name

A stripped commercial shell with the sprinkler and riser pipes left in place and marked with tape.

01 Office

Floors that empty on a lease date

Whole floors and part floors, in towers and in prewar loft buildings. Freight is shared with every other trade in the building, which means the hours you get are the real programme.

We book what we are given, stage material so it is ready when the car is, and keep the corridor and the lobby in the state the managing agent expects to find them.

A loading dock at the back of a commercial building with a roll-off container backed up to it.

02 Retail and restaurants

Ground floor, apartments above

A shop or a restaurant on an avenue is a demolition job with residents overhead. Hours are tighter than a commercial building's, noise carries up through the structure, and the sidewalk in front of the unit belongs to everybody.

Restaurants add grease-laden ductwork through occupied floors, walk-ins, tiled and waterproofed floors, and gas and grease lines that have to be capped by the right trade before anything is cut.

A covered construction container on a city street beside a building entrance, the sidewalk kept clear.

03 Industrial

Where the loading dock solves it

Warehouse and industrial space in the South Bronx, Red Hook, Sunset Park and western Queens has the one thing the rest of the city does not: a dock, a roll-up door and room for a container.

The constraint moves from access to structure. Big floor plates, heavy timber or concrete frames, machinery bases and slabs that need cutting rather than pulling.

A wide view of an East River bridge with low industrial buildings and water towers on the far bank.

The East River and the industrial waterfront

What we hold to on a live floor

Most commercial demolition in this city happens in a building that never closes. The tenant above you is working. The lobby is in use all day. That is the usual case and not a complication, and it is what the price and the sequence are built around.

Protection goes in before anything comes down. Corridors, lobby floors, door frames, elevator cabs and anything staying in the space are covered on day one. It is faster to protect a lobby than to repair one, and a managing agent remembers a damaged corridor far longer than a tidy one.

Dust separation is real: the work area is sealed, with negative pressure where the job needs it. Noisy work gets grouped into the windows the building allows. Debris does not sit in a corridor overnight waiting for a convenient moment, and material leaves on the schedule the building gives us, carted away by a registered carter.

Call (929) 693-6783Before work can start

Common questions

How long does an office strip-out take?

Less than most people assume once it starts, and more than they assume before it does.

The demolition itself is quick. What sets the duration is how much material can leave the building in a day, which is a function of the freight hours you are given, the size of the car, and how far the floor is from it. A floor with four hours of freight a day takes roughly twice as long to clear as the same floor with eight.

We work that out on the walk-through and quote a programme against those numbers, not against square footage.

Can you phase the work around tenants who are staying?

Yes. On most commercial floors in New York that is the job itself.

Phasing means a sealed work area with its own protected route in and out, noisy operations grouped into agreed windows, and a floor that is left safe and clean at the end of every shift, not just at the end of the job. We agree the phase boundaries with you and the managing agent before we start, because moving one halfway through costs more than planning three.

Can you work nights or weekends?

Yes, where the approvals allow it, and it is worth raising at the estimate.

Construction activity outside 7:00 AM to 6:00 PM on weekdays needs an After Hours Variance from the Department of Buildings, filed a few business days ahead and able to cover days inside a fourteen consecutive day window. Your building may also set its own hours, and a co-op or a mixed-use building with residents above usually sets narrower ones than the city does.

Neither of those is an obstacle when it is known at the start. Both are when the programme already assumed evening work.

Have a fit-out date to work back from?